Tumblers in Bulk: The Ordering Timeline, MOQ and Checks From a Manufacturer
Buying tumblers in bulk from a manufacturer is a sequence: quote, sample, approval, production, inspection, shipment. Here is each step at BG Drinkware with the real lead times, the minimum order and what gets checked before your tumblers leave.
Ordering tumblers in bulk at BG Drinkware follows 6 steps: quote, sample, approval and deposit, production, inspection, and balance and shipment. Sampling and production take most of the factory time. A physical sample on an existing model takes up to 7 days, while a new mould takes about 35 days of tooling and sampling. Bulk production then runs 7–12 days, and a ceramic lining adds 2–3 days; printing, engraving and coating fit inside the normal window. For planning, allow about 14–19 factory days from sample to finished goods on an existing model. The standard minimum order is 500 pieces per model and colour; lower quantities for some start-up teams need individual approval. A common payment arrangement is a 30% deposit to start production and the 70% balance before shipment, under whichever Incoterm suits the buyer's logistics. Before shipment, BG Drinkware checks appearance, leakage and insulation on vacuum products, and third-party inspection is welcome. Different logos are counted separately for MOQ.
What are the steps to order tumblers in bulk?
Ordering tumblers in bulk follows six steps, and only two of them, sampling and production, take most of the factory time.
- 1Quote
Model, size, lid, finish, logo, quantity.
- 2Sample≤ 7 days · new mould ~35
A physical unit on the real body.
- 3Approve & deposit
Sign off the sample; deposit starts production.
- 4Production7–12 days
+2–3 days for ceramic lining.
- 5Inspection
BG checks; third-party inspection welcome.
- 6Balance & ship
Any Incoterm you choose.

New to the category? Start with what a tumbler is, its parts and sizes. For how long an order takes, see custom drinkware production timeline.
Who does what at each stage of a bulk tumbler order?
Missing order inputs can delay a bulk tumbler project, so it helps to know what each stage needs.
How long does a bulk tumbler order take?
For planning, allow about 14–19 factory days from sample to finished goods on an existing model if sampling uses the full seven-day window. A new mould needs a longer sample route.
Factory-time estimator
Planning estimate using the full seven-day existing-model sample window (new mould about 35 days), then 7–12 days of production and, if selected, 2–3 more days for ceramic lining. Production lead time starts from receipt of the deposit, with approvals due on the agreed dates. This calculator adds the stages sequentially as a planning example; it is not a promised dispatch date. Actual timing is order-specific. Your review time, payment transfer and shipping transit are not included.
Two things move this most. A new mould replaces the 7-day sample with about 35 days of tooling and sampling. A ceramic lining adds 2–3 days to production; other decoration such as printing, engraving and coating fits inside the normal 7–12 days. Packaging is planned alongside, and custom packaging can carry its own minimum quantity.
What is the minimum order for bulk tumblers?
BG Drinkware's standard minimum order for tumblers is 500 pieces per model and colour, it is negotiable; lower quantities for some start-up teams need individual approval.
If you need several colours at low volume, compare models in the tumbler product range and list the split in your quote request. The factory can then tell you which colours and models can go below 500.
For a gift programme example, see nurse tumblers for hospital staff gifts.
How are bulk tumbler orders paid and shipped?
A common arrangement is a 30% deposit to start production and the 70% balance before shipment, with delivery under whichever Incoterm suits your logistics.
Incoterms are the International Chamber of Commerce rules that set out "the basic roles and responsibilities of seller and buyer, delivery, risk" (ICC, Incoterms 2020). BG Drinkware supports all of them. Three cover most tumbler orders:
| Incoterm | In short | Suits buyers who |
|---|---|---|
| EXW Ex Works | Goods are made available at the factory; the buyer arranges everything from there | Have their own forwarder in China |
| FOB Free On Board | The seller delivers onto the vessel at the named port; sea freight onward is the buyer's | Book their own ocean freight |
| DDP Delivered Duty Paid | The seller delivers to the named destination with import duties paid | Want one landed price to their door |
A dash means the check is not listed as a standard check for that product type; order-specific inspection requirements should be agreed separately.
Swipe the table sideways to see all columns.

What does the factory check before bulk tumblers ship?
BG Drinkware checks appearance on every product type, plus leak and insulation performance on vacuum tumblers, and buyers can add a third-party inspection on top.
| Product type | Appearance | Leak | Insulation | Custom requirements |
|---|---|---|---|---|
| Double-wall vacuum tumblers and bottles | ✓ | ✓ | ✓ | ✓ |
| Single-wall stainless steel cups | ✓ | – | – | ✓ |
| Plastic cups | ✓ | – | – | ✓ |
| Single-wall titanium cups | ✓ | – | – | ✓ |
Swipe the table sideways to see all columns.
"Custom requirements" means whatever you specified for the order, such as logo position, colour match or packing. Write those into the order so they are inspected, not assumed. Third-party inspectors are welcome; give the inspection date and standard when you place the order, and see our quality control process for how in-house checks run.
For how minimum orders work for custom bottles, see custom water bottles with no minimum.

Before you confirm the order, check the purchase order requirements for custom drinkware.
Bulk tumbler ordering FAQ
Can I order fewer than 500 tumblers?
Often, yes. 500 pieces per model and colour is the standard minimum, but it is negotiable; lower quantities for some start-up teams need individual approval. Send your quantity and colour split for a model-specific answer.
How long does a tumbler sample take?
A sample on an existing BG Drinkware model takes up to 7 days. A tumbler that needs a new mould takes about 35 days to tool and sample.
Does custom decoration add production time?
Printing, engraving and coating fit inside the normal 7–12 day production window at BG Drinkware. A ceramic interior lining adds 2–3 days.
Can I send my own inspector before shipment?
Yes. Third-party inspection is welcome in addition to BG Drinkware's own pre-shipment checks. Agree the inspection date and standard when you place the order.
Which shipping terms are available for bulk tumblers?
BG Drinkware supports all Incoterms, including EXW, FOB and DDP. Choose based on whether you have your own forwarder and who should handle import duties.
Sources
For more sourcing topics, browse the BG Drinkware buyer guides.
Start a bulk tumbler quote
Send the model, quantity per colour, decoration, packaging and destination. BG Drinkware will reply with the price, MOQ, sample time and shipping terms for your order.